Dry Waste Collection Centre

About this Project
Yeshwanthpur, Bangalore, India
Consult < Design < Build < Implement and Transfer < Maintain

With a former waste picker running a centre set up by the municipality, this is a great model to replicate. The centre was completely upgraded including rebuilding, storage platform, conveyor belt and baler within 3 months thanks to great partnering with Hasiru Dala and BBMP.

What's great about it?
• Independent waste picker team trained in managing a small factory
• Capacity tripled from 1.25 ton per day to 4 ton per day
• Upgrading 10 more BBMP centres based on this example