Large-scale Mixed Waste processing facility

About this Project
Sulawesi, Indonesia
WASTE CONSULTING I SYSTEM SOLUTIONS

Together with Indonesian plastic recycler Reco, SweepSmart is developing a large-scale mixed waste processing facility, that can sort and process 330 Tons of mixed waste per day into recyclables, compost, Refuse-Derived Fuel and landfill cover, thereby reducing up to 90% of waste sent to the  landfill.  

What's great about it? 

  • First-of-its kind, combining European innovative sorting technology with local solutions for composting and RDF.
  • Maximum valorisation of the waste through integrated processing of mixed waste at scale, within the same building.
  • Optimise quality & costs of equipment: state-of-the-art equipment for critical components, robust locally supplied equipment for basic steps.